MIL-DTL-52007D
2.2.2 Other Government documents, drawings, and publications. The following other Government
documents, drawings, and publications form a part of this document to the extent specified herein. Unless
otherwise specified, the issues of these documents are those cited in the solicitation or contract.
CECOM LR CENTER
13217E7593 Mounting Adapter Assembly Airport Marker Light
(Copies of this document required by contractors in connection with specific procurement functions should
be obtained from the procuring activity or as directed by the contracting officer.)
2.3 Non-Government publications. The following documents form a part of this specification to
the extent specified herein. Unless otherwise specified, the issues of these documents are those
cited in the solicitation or contract.
AMERICAN SOCIETY FOR QUALITY (ASQ)
ASQ Z1.4 Sampling Procedures and Tables for Inspection by Attributes
(Copies of this document are available from www.asq.org or the American Society for Quality,
611 East Wisconsin Avenue, Milwaukee, WI 53202.)
2.4 Order of precedence. In the event of a conflict between the text of this document and the
reference cited herein, the text of this document takes precedence. Nothing in this document,
however, supersedes applicable laws and regulations unless a specific exemption has been
obtained.
3. REQUIREMENTS
3.1 Description. The mounting adapter assembly shall be in accordance with Top Assembly
3217E7593 and as specified herein.
3.1.1 Drawings. The drawings forming a part of this specification are end product drawings. No
deviations from the prescribed dimensions or tolerances is permissible without prior approval of
the contracting officer. Where tolerances could cumulatively result in incorrect fits, the contractor
shall provide tolerances within those prescribed on the drawings to insure correct fit, assembly,
and operation of the mounting adapter. Any data (e.g. shop drawings, layouts, flow sheets,
processing procedures, etc.) prepared by the contractor or obtained from a vendor to support
fabrication and manufacture of the production item shall be made available, upon request, for
inspection by the contracting officer or his designated representative.
3.2 Material. Material shall be as specified herein and on the applicable drawings. Materials not
specified shall be selected by the contractor and shall be subject to all provisions of this
specification (see 6.3).
3.3 Identification marking. Each mounting adapter assembly shall be identified in accordance
with MIL-STD-130, method optional.
3.4 Workmanship. The mounting adapters shall be free from defects or imperfections that might
affect their serviceability or appearance. External surfaces shall be free of burrs, sharp edges
and corners are required, or where they are not detrimental to safety.
2
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business