STANDARDS MILITARY
MIL-R-52000C(ME)
MIL-STD-105 - Sampling Procedures and Tables for Inspection by
Attributes.
MIL-STD-129 - Marking for Shipment and Storage.
MIL-STD-130 - Identification Marking of US Military Property.
MIL-STD-1188 - Commercial Packaging of Supplies and Equipment.
DRAWINGS ME
TA13217E7498 - Reel, Cable. TA13217E7499 - Reel, Cable.
(Copies of specifications, standards, and drawings required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.)
2.2 Other publications. The following documents form a part of this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on date of invitation for bids or request for proposal shall apply.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
Boiler and Pressure Vessel Code, Section IX, Welding Qualifications. (Application for copies should be addressed to the American Society of
Mechanical Engineers, 345 East 47th Street, New York, NY 10017.)
AMERICAN WELDING SOCIETY, INC. (AWS)
D1.1 Structural Welding Code, - Section 5, Qualification. (Application for copies should be addressed to the American Welding
Society, 2501 N.W. 7th Street, Miami, FL 33135.)
3. REQUIREMENTS
3.1 Description. The cable reels shall be in accordance with the applicable drawings, and as specified herein. The reels shall be of steel and when loaded with 100 pounds of cable shall be capable of being lifted axially by the rim from two diametrically opposite sides without permanent deformation of any part of the reel.
3.1.1 Drawings. The drawings forming a part of this specification are end product drawings. No deviation from the prescribed dimensions or tolerances is permissible without prior approval of the contracting officer. Where tolerances could cumulatively result in incorrect fits, the contractor shall provide tolerances within those prescribed on the drawings to insure correct fit, assembly, and operation of the cable reels. Any data (e.g., shop drawings, layouts, flow sheets, processing procedures, etc.) prepared by the
contractor or obtained from a vendor to support fabrication and manufacture of the production item shall be made available, up[on request, for inspection by the contracting officer or his designated representative.
2
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business